Channel: rams•prjk // updates
#OrionOS #ROM #Official #Peridot #U
OrionOS Centauri - OFFICIAL | Android 14
Released: 30/08/2024
▪️Download
▪️Installation
▪️Support
▪️Screenshots
Changelog:
• Initial official release
• Add XiaomiParts (Per-app Refresh rate, Thermal profile, Clear speaker)
• Fix AOD flickering on some device
Notes:
• GApps builds
• Sign builds, integrity strong by default
• Use OrionOS recovery for sideload
Known Bugs:
• Maybe AOD & SoFOD.
Credits:
• Adarsh Grewal and Raghav for their Work.
By @ramshell688
Follow @PocoF6UpdateID
Join @PocoF6Indo
OrionOS Centauri - OFFICIAL | Android 14
Released: 30/08/2024
▪️Download
▪️Installation
▪️Support
▪️Screenshots
Changelog:
• Initial official release
• Add XiaomiParts (Per-app Refresh rate, Thermal profile, Clear speaker)
• Fix AOD flickering on some device
Notes:
• GApps builds
• Sign builds, integrity strong by default
• Use OrionOS recovery for sideload
Known Bugs:
• Maybe AOD & SoFOD.
Credits:
• Adarsh Grewal and Raghav for their Work.
By @ramshell688
Follow @PocoF6UpdateID
Join @PocoF6Indo
🔥7👍2👏1
Forwarded from XFI | Xiaomi Federation Indonesia
Selamat memperingati Maulid Nabi
Semoga kehadiran Nabi Muhammad SAW menjadi cahaya dalam kegelapan, membawa kedamaian, kasih sayang, dan keberkahan bagi seluruh umat manusia.
Teruslah mengikuti jejak-Nya dalam menjaga toleransi, kebaikan, dan saling mengasihi.
12 Rabiul Awal 1446 H
16 September 2024
Semoga kehadiran Nabi Muhammad SAW menjadi cahaya dalam kegelapan, membawa kedamaian, kasih sayang, dan keberkahan bagi seluruh umat manusia.
Teruslah mengikuti jejak-Nya dalam menjaga toleransi, kebaikan, dan saling mengasihi.
12 Rabiul Awal 1446 H
16 September 2024
❤10👍1
#EvolutionX #ROM #Unofficial #Peridot #U
Evolution X 9.4 - UNOFFICIAL | Android 14
Updated: 24/09/2024
▪️Download
▪️Installation
▪️Support
▪️Changelog
▪️Screenshots
Notes:
• Gapps build
• September, 2024 Security patch
• Use EvoX recovery for sideload
Credits:
• Adarsh Grewal and Raghav for their Work.
• Thanks to all tester
By @ramshell688
Follow @PocoF6UpdateID
Join @PocoF6Indo
Evolution X 9.4 - UNOFFICIAL | Android 14
Updated: 24/09/2024
▪️Download
▪️Installation
▪️Support
▪️Changelog
▪️Screenshots
Notes:
• Gapps build
• September, 2024 Security patch
• Use EvoX recovery for sideload
Credits:
• Adarsh Grewal and Raghav for their Work.
• Thanks to all tester
By @ramshell688
Follow @PocoF6UpdateID
Join @PocoF6Indo
❤13🎉4
HTML Embed Code: