Warning: mkdir(): No space left on device in /var/www/hottg/post.php on line 59

Warning: file_put_contents(aCache/aDaily/2025-07-22/post/ramsprojects/-400-): Failed to open stream: No such file or directory in /var/www/hottg/post.php on line 72
#EvolutionX #ROM #Unofficial #Peridot #V @rams•prjk // updates
TG Telegram Group & Channel
rams•prjk // updates | United States America (US)
Create: Update:

#EvolutionX #ROM #Unofficial #Peridot #V
Evolution X 10.7 - UNOFFICIAL | Android 15
Updated:
30/06/2025

▪️Download
▪️Installation
▪️Support
▪️Screenshots

Changelog:
• Fixed HDR/SDR issue.
• Fixed GPhoto unlimited & crash issue.
• Added Refresh rate 60/90/120hz toggle.
• Re-enable sdrHdrRatio.
• Enable elf check.
• Build Display hal from source.
• Force enable prebuilt Audio hal.
• Enable Vulkan HW RenderUI.
• Update GPU driver to v819.
• Improve performance.

Known Bugs:
• Audio for fs19xx driver
• More add FP will broken biometrics in strong app

Notes:
• June, 2025 Security patch
• Use one FP for strong biometrics in app
• Use EvoX recovery for sideload

Credits:
• Adarsh Grewal and Raghav for their Work.
• Peridot Team.
• Thanks to all tester.

By @ramshell688
Follow @PocoF6UpdateID
Join @PocoF6Indo

#EvolutionX #ROM #Unofficial #Peridot #V
Evolution X 10.7 - UNOFFICIAL | Android 15
Updated:
30/06/2025

▪️Download
▪️Installation
▪️Support
▪️Screenshots

Changelog:
• Fixed HDR/SDR issue.
• Fixed GPhoto unlimited & crash issue.
• Added Refresh rate 60/90/120hz toggle.
• Re-enable sdrHdrRatio.
• Enable elf check.
• Build Display hal from source.
• Force enable prebuilt Audio hal.
• Enable Vulkan HW RenderUI.
• Update GPU driver to v819.
• Improve performance.

Known Bugs:
• Audio for fs19xx driver
• More add FP will broken biometrics in strong app

Notes:
• June, 2025 Security patch
• Use one FP for strong biometrics in app
• Use EvoX recovery for sideload

Credits:
• Adarsh Grewal and Raghav for their Work.
• Peridot Team.
• Thanks to all tester.

By @ramshell688
Follow @PocoF6UpdateID
Join @PocoF6Indo
🔥142


>>Click here to continue<<

rams•prjk // updates






Share with your best friend
VIEW MORE

United States America Popular Telegram Group (US)


Warning: Undefined array key 3 in /var/www/hottg/function.php on line 115

Fatal error: Uncaught mysqli_sql_exception: Too many connections in /var/www/db.php:16 Stack trace: #0 /var/www/db.php(16): mysqli_connect() #1 /var/www/hottg/function.php(212): db() #2 /var/www/hottg/function.php(115): select() #3 /var/www/hottg/post.php(351): daCache() #4 /var/www/hottg/route.php(63): include_once('...') #5 {main} thrown in /var/www/db.php on line 16