Warning: mkdir(): No space left on device in /var/www/hottg/post.php on line 59

Warning: file_put_contents(aCache/aDaily/2025-07-22/post/ramsprojects/-400-): Failed to open stream: No such file or directory in /var/www/hottg/post.php on line 72
#EvolutionX #ROM #Unofficial #Peridot #V @rams•prjk // updates
TG Telegram Group & Channel
rams•prjk // updates | United States America (US)
Create: Update:

#EvolutionX #ROM #Unofficial #Peridot #V
Evolution X 10.3 - UNOFFICIAL | Android 15
Updated:
08/02/2025

▪️Download
▪️Installation
▪️Support
▪️Screenshots

Changelog:
• Added Clear speaker
• Added Per-app refresh rate
• Added HTSR and HTSR QS tile
• Enable Sidebar&Multi-windows
• Enable Smart Pixel
• Fix FP not working properly (clean flash in previous build)
• Silence some spammy logging

Notes:
• A14 fw recommended
• February, 2025 Security patch
• Play Integrity pass by default
• Use EvoX recovery for sideload

Credits:
• Adarsh Grewal and Raghav for their Work.
• Thanks to all tester

By @ramshell688
Follow @PocoF6UpdateID
Join @PocoF6Indo

#EvolutionX #ROM #Unofficial #Peridot #V
Evolution X 10.3 - UNOFFICIAL | Android 15
Updated:
08/02/2025

▪️Download
▪️Installation
▪️Support
▪️Screenshots

Changelog:
• Added Clear speaker
• Added Per-app refresh rate
• Added HTSR and HTSR QS tile
• Enable Sidebar&Multi-windows
• Enable Smart Pixel
• Fix FP not working properly (clean flash in previous build)
• Silence some spammy logging

Notes:
• A14 fw recommended
• February, 2025 Security patch
• Play Integrity pass by default
• Use EvoX recovery for sideload

Credits:
• Adarsh Grewal and Raghav for their Work.
• Thanks to all tester

By @ramshell688
Follow @PocoF6UpdateID
Join @PocoF6Indo
🔥17👍6❤‍🔥1💯1


>>Click here to continue<<

rams•prjk // updates






Share with your best friend
VIEW MORE

United States America Popular Telegram Group (US)


Warning: Undefined array key 3 in /var/www/hottg/function.php on line 115

Fatal error: Uncaught mysqli_sql_exception: Can't create/write to file '/tmp/#sql-temptable-a06e-65abc1-3304.MAI' (Errcode: 28 "No space left on device") in /var/www/hottg/function.php:216 Stack trace: #0 /var/www/hottg/function.php(216): mysqli_query() #1 /var/www/hottg/function.php(115): select() #2 /var/www/hottg/post.php(351): daCache() #3 /var/www/hottg/route.php(63): include_once('...') #4 {main} thrown in /var/www/hottg/function.php on line 216